{"id":1394,"date":"2022-07-27T20:36:28","date_gmt":"2022-07-27T20:36:28","guid":{"rendered":"http:\/\/www.freeporthousingny.org\/home\/?p=1394"},"modified":"2022-07-27T20:36:30","modified_gmt":"2022-07-27T20:36:30","slug":"freeport-housing-authority-builds-new-office","status":"publish","type":"post","link":"http:\/\/www.freeporthousingny.org\/home\/uncategorized\/freeport-housing-authority-builds-new-office\/","title":{"rendered":"Freeport Housing Authority Builds New Office"},"content":{"rendered":"\n<p><strong>On October 26th, 2012, Super Storm Sandy reared her terrible wrath onto the Village of Freeport.<\/strong> As gale force winds blew through the streets of Freeport, the ocean swelled with high tide. Escaping the water and flooding was impossible. The tidewaters flooded the streets of Buffalo and Albany Avenues and destroyed the Moxey Rigby Low-Income Housing apartment buildings. A few yards away stood the former Freeport Housing Authority office at 3 Buffalo Avenue. The office flooded with approximately 60-inches, or 5 feet, of water and detritus. Electronics, desks, filing cabinets, and paper files were lost. <\/p>\n\n\n\n<p>Since that event almost 10 years ago, the Freeport Housing\nAuthority has made the Community Center at 240 South Main Street its\nheadquarters. Workstations and filing cabinets replaced the couches and\ntelevision that used to create a gathering place for the tenants. The garage was\nconverted into an office for the Executive Director. It was an inconvenience\nfor the tenants and staff alike. It was mandatory that a new office be built; however,\nthe pressing issue was taking care of the apartments and tenants on Buffalo and\nAlbany Avenues. <\/p>\n\n\n\n<p>Once the New Moxey Rigby Apartment Complex opened in\nNovember 2019, and the vacant apartment buildings were disposed of, the plans\nfor a new office began to take shape. A single-story, energy efficient office\nthat is ADA compliant and handicap accessible, complete with individual offices\nfor staff, increasing the ability to have conversations with tenants and\napplicants; conference room with state-of-the-art technology; a secure file\nroom; and safety and security protocols as required by local and Federal\nagencies.<\/p>\n\n\n\n<p style=\"text-align:center\"> <strong><em>\u201cOur tenants dealt with a lot of devastation and loss from Super Storm Sandy. Our number one priority was taking care of them and their homes,\u201d said John Hrvatin, Executive Director. \u201cNow that they are in their brand-new building, it is time to work on the office. The purpose and goal of the Freeport Housing Authority\u00a0is to provide a stable foundation for low-income families. Our staff needs a stable foundation as well, so we can continue to provide the best service to our community and Freeport. Building this office will give us that foundation.\u201d<\/em><\/strong> <\/p>\n\n\n\n<p>This new office building will be located adjacent to\nReverend Mitchell Mallette Senior Apartments at 100 North Main Street. The\noffice will sit where the courtyard is currently. Only part of the courtyard\nwill be utilized for the office; the remaining portion will receive a facelift\nof sorts, with improved seating and tables for the tenants to enjoy time\noutside. <\/p>\n\n\n\n<p>The FHA was successful in\nobtaining a grant from FEMA for 90% of the cost of the office building, with\nthe remaining balance being paid by the U.S. Department of Housing and Urban\nDevelopment (HUD.) &nbsp;JOBCO, Inc., based in Great Neck, NY was selected as\nthe general contractor.&nbsp;<\/p>\n\n\n\n<p>Construction began in May 2022, and recently hit a major\nmilestone: the foundation was poured! The new office is scheduled to be up and\nrunning in early 2023. Keep checking the FHA website for updates and pictures\nof the progress. <\/p>\n\n\n\n<ul class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering-2.jpg\" alt=\"\" data-id=\"1390\" data-link=\"http:\/\/www.freeporthousingny.org\/home\/new-office-rendering-2\/\" class=\"wp-image-1390\" srcset=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering-2.jpg 640w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering-2-300x225.jpg 300w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering-2-510x382.jpg 510w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption>Architect&#8217;s rendering of the new office &#8211; view from the front\/north side.<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering.jpg\" alt=\"\" data-id=\"1391\" data-link=\"http:\/\/www.freeporthousingny.org\/home\/new-office-rendering\/\" class=\"wp-image-1391\" srcset=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering.jpg 640w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering-300x225.jpg 300w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Rendering-510x382.jpg 510w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption>Architect&#8217;s rendering of the new office &#8211; view from the southeast corner.<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-3.jpg\" alt=\"\" data-id=\"1389\" data-link=\"http:\/\/www.freeporthousingny.org\/home\/new-office-june-construction-3\/\" class=\"wp-image-1389\" srcset=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-3.jpg 640w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-3-300x225.jpg 300w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-3-510x382.jpg 510w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption>&#8220;A beautiful rose begins its life as a seed covered in soil&#8230;&#8221;<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-2.jpg\" alt=\"\" data-id=\"1388\" data-link=\"http:\/\/www.freeporthousingny.org\/home\/new-office-june-construction-2\/\" class=\"wp-image-1388\" srcset=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-2.jpg 640w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-2-300x225.jpg 300w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-2-510x382.jpg 510w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption>Creating the footprint of the new FHA office<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-1.jpg\" alt=\"\" data-id=\"1387\" data-link=\"http:\/\/www.freeporthousingny.org\/home\/new-office-june-construction-1\/\" class=\"wp-image-1387\" srcset=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-1.jpg 640w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-1-300x225.jpg 300w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-June-Construction-1-510x382.jpg 510w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption>FHA&#8217;s version of &#8220;The Big Dig&#8221;<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-1.jpg\" alt=\"\" data-id=\"1385\" data-link=\"http:\/\/www.freeporthousingny.org\/home\/new-office-foundation-1\/\" class=\"wp-image-1385\" srcset=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-1.jpg 640w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-1-300x225.jpg 300w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-1-510x382.jpg 510w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption>The foundation is poured<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-2.jpg\" alt=\"\" data-id=\"1386\" data-link=\"http:\/\/www.freeporthousingny.org\/home\/new-office-foundation-2\/\" class=\"wp-image-1386\" srcset=\"http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-2.jpg 640w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-2-300x225.jpg 300w, http:\/\/www.freeporthousingny.org\/wp-content\/uploads\/2022\/07\/New-Office-Foundation-2-510x382.jpg 510w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><figcaption>Side view of the poured foundation<\/figcaption><\/figure><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>On October 26th, 2012, Super Storm Sandy reared her terrible wrath onto the Village of Freeport. As gale force winds blew through the streets of Freeport, the ocean swelled with high tide. Escaping the water and flooding was impossible. The tidewaters flooded the streets of Buffalo and Albany Avenues and destroyed the Moxey Rigby Low-Income [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1390,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[19,35,1],"tags":[],"class_list":["post-1394","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-announcements","category-news","category-uncategorized"],"_links":{"self":[{"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/posts\/1394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/comments?post=1394"}],"version-history":[{"count":3,"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/posts\/1394\/revisions"}],"predecessor-version":[{"id":1398,"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/posts\/1394\/revisions\/1398"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/media\/1390"}],"wp:attachment":[{"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/media?parent=1394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/categories?post=1394"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.freeporthousingny.org\/home\/wp-json\/wp\/v2\/tags?post=1394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}